General contractor and design-builder for the Pacific Northwest · Since 1971
The front of a large warehouse with a row of loading doors.

Spokane Valley, WACompleted

Columbia Logistics Center

A cross-dock distribution building with tilt-up concrete walls, 116 dock doors and a superflat floor for very-narrow-aisle racking.

Services: Design-Build, Self-Perform Concrete & Carpentry

Plan a project like this →
Ferrowgate Construction, Inc.Sheet A-108
Client
Columbia Basin Industrial REIT
Location
Spokane Valley, WA
Market
Advanced Manufacturing & Industrial
Delivery method
Progressive Design-Build
Scope
New construction
Size
640,000 sq ft
Construction value
$58M
Architect
Ferrowgate design-build team with Basalt Line Architects
Completed
2025
Spokane officeProject record · demo data
640,000sq ftBuilding area
212Tilt-up panels
116Dock doors
How it was built

The problems this project had to solve.

Tilt-up by our own crews

Our crews cast and stood 212 concrete wall panels on the building's own slab and erected the full perimeter in seven weeks.

A floor built for the racking

The racking tenant needed a very flat floor. We placed the slab in long strips and measured its flatness the day after each pour.

Priced in stages

Under progressive design-build, the price was agreed in two stages: site and structure first, then the building and interior once the tenant was known.

Zero recordable injuries in 298,000 hours worked

Across the whole project, all trades included.

Safety program