General contractor and design-builder for the Pacific Northwest · Since 1971

General contractor · Design-builder · Since 1971

We build the hospitals, schools and workplaces the Northwest runs on.

Preconstruction, construction management and design-build from four offices in Oregon, Washington and Idaho, with our own crews on the work that sets the schedule.

Portland, ORSeattle, WABoise, IDSpokane, WAEmployee-owned

The company in figures

Employee-owned since 2009, building in the Northwest since 1971.

Numbers owners and sureties ask for first. The safety figures are dated; the method is on the safety page.

55yearsBuilding in the Northwest
1,150Employee-owners
4Offices in three states
$1.4BWork in place, 2025
0.68EMR, 2025 calendar year

Demo figures for a fictional company. Replace them in data/company.ts.

Services

From the first estimate to the last punch-list item.

  1. S-01PreconstructionEstimating, scheduling and constructability before the first shovel.
  2. S-02Construction Management at-RiskYour builder at the design table, with a guaranteed maximum price.
  3. S-03Design-BuildOne contract for design and construction.
  4. S-04General ContractingA firm price for a finished design, built by people who self-perform.
  5. S-05Self-Perform Concrete & CarpentryOur own crews on the work that sets the schedule.
  6. S-06VDC & PrefabricationModel it, clash it and build parts of it in a shop.
Delivery methods we work under
How each method sets the price
MethodHow it works
CM at-RiskCMARWe join during design, price as it develops and commit to a guaranteed maximum price before construction.
Design-BuildDBOne contract with us for design and construction, with the architect and engineers on our team.
Progressive Design-BuildPDBDesign-build selected on qualifications, with the price agreed in stages as the design progresses.
General Contracting (Hard Bid)GCWe price complete construction documents and build them for a lump sum.
How to choose a delivery method
Three people in high-visibility vests talking in a metal-clad workshop.
Safety

Every shift starts with the First Hour.

Before any task starts, the crew plans it at the work face: what could hurt someone, what will prevent it, and who can stop the work. Anyone on our sites can stop work, including trade partners and visitors.

0.68Experience modification rate (EMR)
0.84Total recordable incident rate (TRIR)

2025 calendar year. Demo figures.

A crew building a timber structure among tall trees.
Careers

Build something you can drive past in fifty years.

Project engineers, estimators, superintendents, carpenters, cement masons and apprentices. Pay ranges are on every posting, and every eligible employee receives shares in the company.