Lower-carbon buildings start in preconstruction.
Most of a building's embodied carbon is decided before we break ground. We price it alongside cost and schedule, then measure what happens on site.

- Measure embodied carbon early
Whole-building embodied carbon estimates at schematic design on every project over 50,000 sq ft, so structure and envelope choices are made with carbon in view.
- Build with timber where it fits
Mass timber and hybrid structures offered as an alternate on suitable projects, priced alongside steel and concrete.
- Cleaner jobsites
Grid power instead of diesel generators where the utility allows, electric small equipment and idle limits for trucks.
- Divert waste
Sorted waste streams on every site, with monthly diversion reports to owners.
Measured · 2025 calendar year
What we measure, and report to owners.
Illustrative demo figures. Replace them with measured results and state the method.
84%Construction waste diverted from landfill
31LEED, WELL or Zero Energy projects delivered
22%Lower jobsite fuel use than 2021
Certified work
Certified and targeted projects in the portfolio.

HealthcareCompleted
Riverside Medical Pavilion
- Portland, OR
- 212,000 sq ft
- 2025

EducationCompleted
Hollis Hall Science Building
- Seattle, WA
- 118,000 sq ft
- 2025

Commercial & WorkplaceUnder construction
Alder Street Offices
- Portland, OR
- 265,000 sq ft
- 2027

Commercial & WorkplaceCompleted
Pier Nine Workplace
- Seattle, WA
- 58,000 sq ft
- 2025

Civic & PublicCompleted
Westbrook Public Library
- Beaverton, OR
- 38,000 sq ft
- 2024

Civic & PublicCompleted
Cedar Basin County Services Annex
- Salem, OR
- 64,000 sq ft
- 2023

Multifamily & Mixed-UseUnder construction
The Larch Apartments
- Boise, ID
- 212,000 sq ft
- 2027