General contractor and design-builder for the Pacific Northwest · Since 1971
A glass facade reflecting the trees in front of it.

Seattle, WACompleted

Hollis Hall Science Building

Teaching and research laboratories for chemistry and biology, with a glazed public ground floor opening onto the campus quad.

Services: Preconstruction, Construction Management at-Risk, VDC & Prefabrication

Plan a project like this →
Ferrowgate Construction, Inc.Sheet A-103
Client
Lakeshore University
Location
Seattle, WA
Market
Education
Delivery method
CM at-Risk
Scope
New construction
Size
118,000 sq ft · 5 stories
Construction value
$96M
Architect
Aldercroft Partnership
Completed
2025
Certification
LEED Gold
Seattle officeProject record · demo data
118,000sq ftFloor area
64Fume hoods
5Estimates before the GMP
How it was built

The problems this project had to solve.

Priced at every stage

We joined at schematic design and delivered five estimates before the guaranteed maximum price. Three of the university's early decisions, including the lab exhaust strategy, were made on our numbers.

Labs coordinated with the people who use them

Researchers walked a full-size lab mock-up in the second month of construction. Their changes to bench heights and service locations were made before any casework was built.

A quiet building for sensitive work

Imaging rooms in the basement were isolated on their own slab. Vibration was measured against the design criteria before the rooms were handed over.

Zero recordable injuries in 344,000 hours worked

Across the whole project, all trades included.

Safety program
Their estimates let us make the big decisions early, when they were still cheap to make.
Associate Vice President, Capital Projects, Lakeshore University · Demo testimonial
Talk to the team that built it

Tom Brandvold

Regional Manager, Western Washington